Test Paper 4 – WHO GMP Training
Section – Validation




WHO GMP Training Questions and Answers Section for pharmaceutical manufacturing units :- Section Validation Test Paper 4

In this post i am giving some questions of which you may know answers or you may like to know answers ,i have given few options for you to think up on , this is a very good tool to gather knowlede these questions are provided with answers at the bottem of every page ,so enjoy solving them, you can use these questions and answer sheet to train your personnels.


1. The basic elements of validation are:

.(A) .Evidence that all aspects of a manufacturing process achieve the expected result.

.(B) .Documented evidence that all aspects of systems, facilities, equipment and manufacturing processes achieve the expected result.

.(C) .Documented evidence that the equipment used in manufacturing works as it is intended to.

.(D) .A record of how a manufacturing process works.


2. Prospective validation is carried out:

.(A) .Periodically and/or after major changes.

.(B) .For a production process that has been operating for 6 months.

.(C) .During the research and development phase.

.(D) .While a new product is being commissioned on the plant.


3. Concurrent validation is carried out:
.(A) .Periodically and/or after major changes.

.(B) .For a production process that is routinely used.

.(C) .During the development phase.

.(D) .During the normal production of a batch.


4. Retrospective validation is carried out:

.(A) .Periodically and/or after major changes.

.(B) .For a production processes that have been used on a routine basis, based on analysis of accumulated data.

.(C) .During the development phase.

.(D) .Whilst a new product is being commissioned on the plant.


5. Revalidation is carried out:

.(A) .Periodically and/or after major changes.

.(B) .For a production process that is already up and running.

.(C) .During the development phase.

.(D) .While a new product is being commissioned on the plant.


6. The purpose of design qualification is to check:

.(A) .Has it been built correctly?

.(B) .Has it been designed correctly?

.(C) .Does it produce product correctly?

.(D) .Does it work correctly?




7. The purpose of installation qualification is to check:
.(A) .Has it been built/installed correctly?

.(B) .Has it been designed correctly?

.(C) .Does it produce product correctly?

.(D) .Does it work correctly?


8. The purpose of operational qualification is to check:

.(A) .Has it been built correctly?

.(B) .Has it been designed correctly?

.(C) .Does it produce product correctly?

.(D) .The dynamic attributes of a piece of equipment and whether it works correctly?


9. The purpose of performance qualification is to check:
.(A) .Has it been built correctly?

.(B) .Has it been designed correctly?

.(C) .Does it produce product correctly?

.(D) .Does it work correctly?


10. The purpose of a validation master plan is:

.(A) .To list the tests and acceptance criteria for the entire validation programme.

.(B) .To provide an overview of the policy on validation.

.(C) .To record the results of tests carried out during validation.

.(D) .All of the above.


11. The purpose of a validation protocol is:

.(A) .To list the procedure, tests and acceptance criteria.

.(B) .To provide an overview of the whole programme.

.(C) .To record the results of tests carried out during validation.

.(D) .All of the above.


12. The purpose of a validation report is:

.(A) .To list the tests and acceptance criteria for all the validation programme.

.(B) .To provide an overview of the whole programme.

.(C) .To record and present the results of tests carried out during validation.

.(D) .All of the above.




Test Paper 4 – GMP Training

Section – Validation

Answers



.1. .B

.2. .C

.3. .D

.4. .B

.5. .A and B

.6. .B

.7. .A

.8. .D

.9. .C

.10. .B

.11. .A

.12. .C

Following are some of articles which;will be useful for you in further understanding of aspects of sterile dosage form manufacturing

Pharmaceutical Validation

Cleen Room Classification

Pharmaceutical Industry

Pharmaceutical Manufacturing

Clinical Trials

Pharmaceutical

To Find Pharmaceutical jobs and make a Pharmaceutical careers see here pharmaceutical companies

No comments:

Posted by: Martin

How to sucessfuly activate and receive our articles on pharmaceuticals by E-Mail

Dear readers if you wish to receive our articles on pharmaceutical automatically into your email Inbox , as and when we write a new article over this website, then follow these 3 simple steps.


1.You should write your Email ID in the box provided and push the subscribe butten


2.Enter the text code that we show you in a small new browser window after you enter your email ID.

3.Log in to your email and Cheke our verification email sent by "FEEDBURNER" , there you should verify the link we send you by email.




Enter your email address get our articles by email whenever this website is updated





Delivered by FeedBurner



Join the list of our readers from Universities ,Research and Development centers Pharmaceutical Companies from all over the world.











Pharma Research Regulatory Guidelines Website
Texas Dallas, TX 75211 US
Email: editor@pharmacistspharmajournal.org Website: http://pharmacistspharmajournal.org/
Copyright © 2008-2015 all rights reserve www.pharmacistspharmajournal.org